Skip to content
CrestWatt

Independent electrical inspection and witness on site.

CrestWatt places electrical site supervisors and QA engineers on client sites to inspect, witness and record subcontractor works against specification. The engineer reports to the client’s electrical site manager and maintains an independent record of every inspection and test.

Standards and methods cited

  • Digital inspection records
  • Daily defect reporting
  • Weekly quality report
  • DNO / ICP witness points
Electrical site supervisor inspecting transformer station works and recording results on site.

Scope

  • Field inspection of earthing, DC and AC cabling, inverters, LV distribution and transformer stations against drawings, specification and OEM requirements
  • Witness of subcontractor tests, with independent verification where required
  • Structured digital inspection records on standard checklists, completed on site on the day
  • Daily defect and observation reporting
  • Weekly progress and quality reporting against programme
  • Readiness for energisation assessment and support to the commissioning lead
  • Interface with the DNO and ICP on witness points and adoption inspections

Boundaries

Supervisors inspect, witness and record. They do not direct the subcontractor’s workforce and do not carry out HV switching unless separately contracted and authorised. The separation preserves the independence of the record.

Commercial basis

Monthly all-inclusive rate covering engineer time, accommodation, travel and expenses, pro rata for partial months. Typical engagements run eight to sixteen weeks through installation and commissioning.

Recent scope

  • 40 MW solar farm, West Yorkshire: embedded electrical site supervisor through installation and commissioning, inspecting the main electrical subcontractor’s earthing, inverter, LV and transformer station works, with digital records and daily reporting to the client’s electrical site manager

Electrical Site Supervision and QA — common questions

What does an electrical site supervisor actually do?

Field inspection of earthing, DC and AC cabling, inverters, LV distribution and transformer stations against drawings, specification and OEM requirements; witness of subcontractor tests; structured digital records on standard checklists completed on the day; daily defect reporting; and weekly progress and quality reporting against programme.

Do supervisors direct the installation subcontractor?

No. Supervisors inspect, witness and record. They do not direct the subcontractor’s workforce and do not carry out HV switching unless separately contracted and authorised. That separation is deliberate — it preserves the independence of the record.

How is site supervision priced?

On a monthly all-inclusive rate covering engineer time, accommodation, travel and expenses, pro rata for partial months. Typical engagements run eight to sixteen weeks through installation and commissioning.

Next step

Send the programme. We will propose a supervisor and a start date.